Beispiele aus Textkorpus für hot water cylinder
1. For example, the payback time for loft insulation is 13 years and 38 years for hot water cylinder and pipework insulation.
2. See whether house is heated by underfloor system or radiators. '. Categorise type of material used to insulate hot–water cylinder. 10.
3. They must also take photographs – for example, of the inside and outside of your home, of the boiler and the hot water cylinder – to back up this data, which will then be fed into a computer to give your house a grade on a scale of A (the most efficient) to G (the worst). "Last week," says Jeremy, "a bunch of my students missed a boiler because it was in a bedroom wardrobe and they felt uncomfortable opening the door.